First, the workers done some minor damage on the roads. Then use the excavators to “clip” the pieces.

How Japanese Rebuild Road

The whole process was almost no noise. Please note that the thickness of each piece of the Asphalt. In addition, the tools and vehicles are all clean and tidy.

How Japanese Rebuild Road

After the digging process, the workers will deliver those piece to elsewhere rather than depositing on the road side. Noticed that the dug level was as high as the worker’s knee! They are all so serious and respect their work. They were all wearing their uniform, working hot and sweating under the sun. They never try to take off the cloth.

They do not completely put on the Asphalt, but putting the first 10 centimeters thick Asphalt. Following by rollover the ‘pressure’ roller machine. After the ‘pressure’ process, the thickness gone at least half. And then follow by repeating the same steps again. Till the

And then follow by repeating the same steps again. Until they the road is perfectly covered.

How Japanese Rebuild Road

How Japanese Rebuild Road

You don’t even realize the difference. It was so perfect and tidy!

Even 5 months later, you also wont be able to find a defect spot at all.

How Japanese Rebuild Road

It is amazing about how Japanese respect the work.